Display your news / advertisements here : mail to trivandrum.co.in@gmail.com

Events-Contests-Offers-Sports

SHOPPING, FOOD & TRAVEL

More Shopping, Travel n Food>>

Services, Places, Govt & Health

More Services >>

Tuesday, November 15, 2011

Murinjapalam Bridge Construction: Old Bridge Demolition on November 16

Trivandrum, November 15, 2011: The bridge across Pattom pond, the Murinjapalam bridge is going to demolish on November 16th.

The authority assured the proposed new bridge will be completed in 200 days. For the use of pedestrians a small bridge will be availed. Vehicles should take another way to approch Medical College.

The experimental closure of the road took place on November 13 and 14, where November 14, Monday gave a very bad response from the public as it made an unusual blockade in the Medical college road.

Authority taking Medical college emergency cases in to consideration, kept Chalakuzhy road as one way.

The New Bridge
The proposed bridge is a four line, with 14.3 metre width. It will have pavements in both sides with 1.5 metre width. The bridge will have 21 metre length

No comments:

Copyright 2004-2017 Trivandrum.co.in email: trivandrum.co.in@gmail.com

About us | Contact us | Advertise | Submit Information